The Overall Planning Supplier of Carton Plant (Providing pre-sale ,sale, after-sale services) Pre-sale.
Conducting feasible plan after getting relevant data from clients
1.Equipment cost and freight
2.Factory cost(If without existing workshop)
3. Cash Turnover amount.
4.The number of workers, and the layout of total power, water, gas source, etc..
5.Recommending best equipment plan, also design and produce products according to the special demand.
Sale
1.Assisting with plan the equipment diagram and the installation of infrastructure
2.Providing the list of a full set of consumables and spare parts.
3.Provide the design drawings of all varieties of cartons and paper box for free.
4. Strictly implement the contract and deliver on time.
After-sale
1.Appoint technical personnel with on-site installation and debugging.
2.Training the operators of production line.
3.Prepared with professional translator cooperated to solve the emergency of plant for a long time.
Remark:
If there are any dissatisfaction when in the process of implementation, please contact qs@qishengpack.com
Dear Client,
Firstly thanks for choosing our products!
In order to guarantee the quality, make our quality responsibility clear, ensure the qualified products and safe production, we do hereby make following guarantees.
1.Ensuring the normal shipment for machine, each machine has a collet preventing the machine colliding with each other.
2.The warranty time is calculated according to the product shipment. One year warranty. All accessories are provided free of charge within one year.
3.Charging the appropriate fees of accessories after expiration of warranty period. Lifetime service is provided.
4.We bear the all responsibilities when there are quality issues, including the replacement costs.
5.If there are products malfunction where clients couldn’t solve themselves, we would send technicians abroad repairing in the fastest time. (Or Clients looking for the local maintenance worker to repair with our agreement. We bear the maintenance costs during the warranty time.)
Remark: The tickets and Visa fees of maintenance workers were paid by clients during the warranty period. The international courier fees for accessories were paid by clients. We provide maintenance and accessories are free of charge.
Please send us the information as following:
1.What is the requested production capacity you need? Say how many boxes per day?
2.How many ply corrugated cardboard do you need ? 3ply? 5ply? Or 7ply?
3.What is the maximum size of your carton should be? (length, width and height)
4.How many colors you are going to print on the carton?
5.Do you also produce paper box? Or just carton box?
6.Whether there has been factory workshop now?(if you have , please send us your factory workshop plan)
We will quote you the suitable production line upon receipt of your reply
A. Technology
1.Production Process
Beginning with body paper, corrugated board is made through the process of high temperature, high pressure, roll compacting and gluing. After that, make it into the required cardboard sheet through the process of drying, grooving, slitting and trimming. Then by means of printing, slotting, die cutting, stapling or sticking box, make it into the required finished product of carton box.
2.Finished Product
The Carton box is made from corrugated board. The type of paperboard is divided into double wall (single sided single corrugated), triple wall (two-sided single corrugated), quintuple wall (two-sided two corrugated cored paper), septuple wall (two-sided three corrugated two cores paper) and so on.
3.Machine
The machine is manufactured by Shanghai Qisheng Packing Machinery Factory. We will supply the most advanced high quality corrugated paper board production line and print fluting machine.
B. Consumable Requirement
1. Body Paper: Kraft paper, corrugated paper, core paper and so on.
2. Adhesive: Starch, sodium borate, caustic soda, additive and so on.
3. Printing Material: water-based ink
4. Tape yarn: 16#,17# , 18#
5. Others: Resin plate, slab rubber, rubber belt, packing belt and so on.
C. Plant Requirement (The plant will be confirmed according to customer’s present workshop or different schemes.)
1. Paperboard Workshop:
2. Carton Box Workshop:
3. Raw Material and Finished Products Warehouse:
4. Steam boiler etc.
D. Equipment Requirement (We will match the different machines according to different capacity. )
E. The Quantity of Staff Members (After confirming the selected machines, the quantity of staff members will be listed for you.)
F. Economic Analysis
1. Aggregate Investment (Depends on the big or small of the plan)
(1) Equipment Investment (2) Cash Flow (3) Contingency Cost (4) Plant Investment:
2. Annual Output and Output Value
G. Items Provided by Client
1. Steam Boiler
2. Water Treating Equipment
3. The Pipeline of Water, Electricity and Gas
4. Civil Construction and Material for Foundation
5. Power Supply System (380V、50Hz ,installing transformer according to the 120% of total quantity of power distribution)
6. General Distribution Cabinet
7. The pipeline from distribution board to equipment control cabinet, and from control cabinet to equipment)
8. Body paper needed for trial run (Surface paper and Riva paper according to the GB5034-8
9. Be responsible for the civil work of equipment foundation.
10. Be responsible for hoisting and discharging the equipment to the specified location.